Size an irrigation borehole pump around the zones that must operate together, the pressure needed at their outlets and the borehole’s confirmed supply conditions. Establish a flow/head requirement for each planned operating combination, then check the candidate pump and controls against those requirements. Field area and motor HP alone do not establish a suitable pump.
Begin with a zone list, the selected sprinkler or dripper data, the pipe routes and a borehole test record. The useful selection question is how much water the system must deliver at the required pressure while that particular zone is running.
Build a load list for each irrigation zone
For each zone, record the outlet model, nozzle or emitter size, quantity and required operating pressure. Use the flow associated with that pressure in the manufacturer’s performance information. Different sprinkler nozzles and coverage arcs can have different flows, even when the sprinkler bodies look alike.
Hunter’s Flow-Clik manual describes estimating zone flow by finding the nozzle flow at its operating pressure and adding the outlets within the zone. A count of heads becomes useful only when their individual demands are known.
The following example uses assumed equipment data, with only one zone running at a time:
| Zone | Assumed operating load |
|---|---|
| A: lower sprinkler area | Six sprinklers, each delivering 0.30 m³/h at 2.5 bar: 6 × 0.30 = 1.8 m³/h. |
| B: drip area | 800 drippers, each delivering 2 L/h within its specified operating conditions: 800 × 2 = 1,600 L/h = 1.6 m³/h. |
| C: higher sprinkler area | Six sprinklers with the same assumed flow and pressure as A: 1.8 m³/h, but on a different route and elevation. |
These are teaching assumptions, not standard sprinkler pressures or dripper specifications. Replace them with the selected equipment’s data.
The installed flows add to 5.2 m³/h, but the example’s schedule never calls for that combined flow. If A and C must run together, their demand becomes 3.6 m³/h, and the shared pipe losses and source conditions must be recalculated for that combination. The valve and pump-control sequence must support the intended schedule.

Calculate head from the pumping water level
For direct irrigation from a borehole, the pump must overcome the lift from the operating water level, the elevation to the critical outlet, the outlet’s required flowing pressure and the losses along the water route. The critical outlet may be the highest, the most distant or one with a more demanding pressure requirement.
Use the pumping water level appropriate to the proposed abstraction and seasonal conditions. Total drilled depth and pump installation depth are different measurements. If the operating water level already includes drawdown, do not add that drawdown again.
Grundfos explains groundwater pump sizing using dynamic water level, delivery requirements, losses and the required flow/head point. For this simplified water-system estimate, 1 bar is approximately 10.2 m of head.
Include friction through the complete rising main, ground-level mains, valves, filters and the relevant branch route. Pipe below the pumping water level still contributes friction, even though geometric lift starts at the water level. Use the actual flow in each pipe section; the common main carries more water than an individual lateral.
Filter losses also need an appropriate operating allowance. Netafim’s drip-irrigation guide explains filtration and changing filter pressure loss. Use the selected filter’s requirements and service conditions rather than a fixed percentage of lift for every system.
Same flow, different head: compare zones A and C
Assume that at the example’s sprinkler-zone abstraction, the pumping water level is 25 m below the borehole ground reference. Both sprinkler zones require 2.5 bar at their critical outlets, equivalent to about 25.5 m of water head.
For zone A, assume the critical sprinkler is 5 m above that ground reference and the total route loss is 7 m at the zone’s operating demand:
Zone A head = 25 + 5 + 25.5 + 7 = 62.5 m, approximately 63 m at 1.8 m³/h.
For zone C, assume an outlet elevation of 10 m and a different route with 9 m of losses:
Zone C head = 25 + 10 + 25.5 + 9 = 69.5 m, approximately 70 m at 1.8 m³/h.

The two sprinkler zones need the same flow but different head. Zone C is more demanding than A in this example. Zone B still needs its own head calculation, pressure-control assessment and curve check before a pump can be accepted for the whole system.
The losses and water level above are stated assumptions, not measurements or a completed pipe design. The result identifies requirements to check; it does not identify an approved pump model.
Match the zone plan to borehole supply and available time
Assume, separately, that the borehole’s approved operating plan permits abstraction up to 2.0 m³/h. The planned single-zone demands of 1.6 or 1.8 m³/h fall below that limit. Running A and C together at 3.6 m³/h would exceed it. A larger pump would not resolve that supply mismatch.
These comparisons concern planned demand. Confirm the actual pump flow under the chosen controls, the corresponding water level and the permitted operating period. Grundfos’s groundwater-well explanation shows why pumping tests relate flow to water-level response. A static level or short burst of water is insufficient evidence of sustained supply.
Also check daily water volume and the irrigation window. For sequential zones, the total running time is the sum of their individual times. Required water volume depends on crop stage, soil, weather and the irrigation design; leave time and capacity for the specified flushing or filter-cleaning operations. Peak flow alone does not prove the day’s watering can be completed.
If a storage tank separates borehole abstraction from irrigation, size the borehole-to-tank duty and tank-to-field duty separately. The tank changes the supply arrangement; the field still needs an appropriate delivery flow and pressure.
Check the curve and controls across the zones
Read each required flow and head together on the candidate pump’s performance information, and check the manufacturer’s permitted operating range. Grundfos’s pump-curve explanation provides the background for comparing pump and system behaviour. Maximum flow and maximum head are different operating conditions, not a pair that can be delivered simultaneously.
The requirements calculated for A and C do not mean a fixed-speed pump will naturally settle at both exact points. The pump, pipework and pressure-control arrangement determine the actual operation. Check how pressure is managed in the lower-resistance zone, and how the system behaves when a small zone opens, valves change or demand stops.
A drip zone may need a different pressure regime from the sprinklers. Netafim’s pressure-compensating dripper information specifies operation within a pressure range and filtration requirements. Pressure compensation does not remove those requirements or make arbitrary inlet pressure acceptable.
Check minimum stable flow, motor cooling where applicable, starting limits, maximum system pressure and source protection with the pump supplier. Flushing and backwashing can create a different load from normal irrigation; include the intended maintenance mode in the design.
Prepare the selection and handover information
Send the supplier the zone schedule and outlet data, borehole test results, seasonal water-level information, pipe internal sizes and lengths, elevation survey, filter and regulator requirements, electrical supply and intended control method. Identify any zones that must operate together.
Use QDD’s irrigation application requirements to organise the job, or submit the inputs through pump selection help. Request the proposed curve and operating range, with the assumptions for each zone and the source-protection strategy.
At commissioning, record zone flow, pressure at representative and critical outlets, pumping water level and control settings under the agreed operating modes. Verify the approved low-water and shutdown functions. Those readings provide a baseline for later changes, filter servicing and performance checks.