Borehole Pump Check Valves: What to Check Before Installation

Confirm the pump's built-in check valve before ordering extra valves. Match their positions and ratings to the actual system, and locate pressure observations on the correct side of each valve.

A plain brass inline valve beside black PE pipe and plumbing connectors on a workshop bench.

Before ordering a borehole pump check valve, confirm whether the exact pump already includes one and what its installation manual requires outside the pump. The total number and positions depend on the pump, rising main, water levels and delivery arrangement. Borehole depth alone does not give a universal valve count.

For a new installation, start at the pump outlet and work along the water path. For an existing system with falling pressure, noise or repeated starts, record what happens before adding another valve. A new valve at the borehole head can change which part of the system holds pressure without resolving a fault farther down the pipe.

If records are incomplete, send the pump model, an accessible photo of the above-ground pipework and a description of the water destination to the supplier or installer. Mark buried valve positions as unknown rather than guessing.

What the check valve controls

A check valve, also called a non-return valve or NRV, allows flow in the intended direction and is designed to oppose reverse flow. In a borehole supply, the relevant direction is from the pump toward the delivery system. The basic automatic action is explained in Spirax Sarco’s check-valve guide.

The correct arrangement helps control the water column when the pump stops. Reverse flow and unsuitable valve behaviour can contribute to backspin or damaging pressure changes. The valve type, location and closing behaviour therefore matter alongside its connection size.

A check valve has a different job from a manual isolation valve. Its presence also does not establish that the installation has a certified backflow-prevention assembly for cross-connection protection. Identify each device by its actual function and approval, rather than calling every valve in the line a non-return valve.

Begin with the valve at the pump outlet

Use the full pump model and supplied configuration, not only the motor’s power rating. Ask for the installation manual or a parts drawing showing whether a valve is fitted in the pump’s discharge assembly.

Record the answer as built-in, separate valve required, or not yet confirmed. Some pump families have different supplied valve configurations: the Grundfos SP A, SP data booklet, for example, describes valve options on page 8. A familiar series name or an outlet that looks similar to another pump is insufficient evidence.

If there is no built-in valve, obtain the manufacturer’s requirement for the external valve and its position. A valve installed near the surface does not automatically fulfil a requirement for one close to the pump.

The Franklin Electric 50 Hz AIM manual, for example, gives specific conditions for a check valve where the pump has none built in, and directs deeper installations to the pump manufacturer’s recommendations. These conditions should be checked against the actual pump and installation; they are not a universal spacing table.

A plain brass inline valve beside black PE pipe and plumbing connectors on a workshop bench.
Illustrative component review. Confirm the actual valve type, rating and position from the equipment documents.

Before ordering the separate part, identify its approved type, flow direction, orientation, connections and pressure rating. A generic valve with matching threads may still be unsuitable for the duty or water conditions. Confirm these details on its datasheet.

Decide additional valve positions from the actual layout

Ask the installer to mark every known valve on a simple water-path sketch: the pump discharge, rising main, borehole head and onward delivery pipe. Distinguish valves already inside equipment from separate parts that must be supplied.

Then compare the sketch with the exact pump manual. The PUMPA INOX LINE SPP4 manual distinguishes its installation conditions for open discharge and pressure systems, and gives its own additional-valve recommendations. Applying those distances to an unrelated pump would discard the conditions that made them relevant.

This is why “one at the pump plus one every fixed number of metres” is an incomplete buying instruction. First establish the model, system type and applicable manual. Ask the supplier to identify the relevant instruction and explain how the proposed positions satisfy it.

More valves also change the hydraulics. Include the selected valve’s flow loss in the system calculation, and check its closing behaviour in the proposed arrangement. Adding valves is not a general cure for water hammer. Where valves can isolate sections of the rising main, the installer must consider what happens if a lower valve leaks or a section loses water.

Prepare a valve configuration record

A useful order identifies the intended positions and conditions, rather than just asking for several valves of one nominal size. Use the information already available, then complete missing engineering details with the installer.

Item to confirmWhat to record
Pump and supplied valveFull pump model/configuration, built-in valve status and supporting document
Rising mainPipe material, internal diameter, length, pump setting and relevant pumping water level
Water destinationOpen storage tank or pressure supply, delivery elevation and required pressure
Valve positionsKnown existing valves and each proposed additional position, with the manual reference
Valve selectionApproved type, connections, materials, orientation, flow-loss data and pressure rating
Controls and special featuresTank/control type and any documented drain-back, bleed or air-control arrangement

Check pressure at the valve’s proposed position under the relevant conditions. The water column, the pump’s maximum pressure and pressure transients can affect the selection; a normal tank-gauge reading alone is not a complete pressure-rating check. The designer should establish the maximum conditions and suitable ratings for the valve, pipe and fittings together.

Where a system is intentionally arranged to drain or manage air, retain its documented design until it has been assessed. Do not turn a factory option or another system’s drain-back method into an instruction to drill, remove or bypass a valve.

What falling pressure or a bang after stopping can tell you

Start with observations that do not require opening the system. Note when the pump stops, where the gauge is connected, whether water is being used and what happens before the next start. Describe whether the system previously worked normally or has just been installed or altered.

Pressure-holding observations apply to an enclosed pressure supply. For a pump filling an open tank, interpret delivery, stopping and restarting through that system’s filling and control arrangement; do not apply a pressure-tank holding test to the open discharge.

  • Pressure falls with outlets closed. Possible causes include leakage or reverse flow in a connected part of the system. Record the gauge position and check whether there is any intended water withdrawal. The pressure change alone does not locate a faulty valve.
  • There is a bang or movement at stopping or restarting. Valve closure, water-column movement and pipe support may need investigation. Repeatedly restarting the pump or fitting extra valves without finding the cause can leave the underlying problem in place.
  • Water arrives late or with air after restarting. Record the delay and the operating history. Source conditions, air entry, pipe faults and any intentional draining arrangement need to be distinguished before blaming the check valve.

If repeated starting is the main symptom, include the pressure controls and tank in the investigation alongside the pipework. Replacing a valve alone may leave a control or tank problem unresolved.

A pressure gauge only reports its connected side

Consider an existing installation with a surface check valve between the borehole pipe and a pressure tank. The gauge is on the tank side. When that valve closes, the gauge can continue showing tank-side pressure even if conditions in the pump-side pipe are different.

A schematic separates the pump-side rising main from a tank-side gauge with an existing surface check valve; a tank-side reading does not verify pump-side condition
Illustrative observation points in an existing pressure system. A closed surface check separates pump-side and tank-side conditions; the tank-side gauge cannot establish the state of the rising main or lower valve. Confirm the pump-outlet valve separately.

A steady reading on that gauge therefore does not prove that the lower valve or rising main is sound. This distinction matters when an extra surface valve is proposed to make a falling reading disappear. Identify the affected section before deciding on a repair.

Franklin’s AIM manual describes a related failure: a leaking lower check with a sealing upper check can allow a void to form in the pipe, followed by a damaging shock on restart. It is one reason to assess the arrangement rather than adding another valve to mask a symptom.

Have the installer plan the necessary isolation and tests. A stopped pump can leave water under pressure; stopping the motor is not the same as making pipework safe to open.

Confirm the installed arrangement before handover

Before lowering the pump, record the actual valve parts and positions that will become inaccessible. Check the real valve’s flow marking, permitted orientation and connection details against its documentation. Installation and tightening requirements come from the selected equipment, rather than a generic instruction for every valve.

An installer and farm owner studying a paper installation sketch beside a closed water tank.
Illustrative planning discussion. Use the pump manual and installation record to confirm which valves are present and where they are fitted.

During commissioning, check normal delivery, stopping and restarting under the intended controls. Record pressure behaviour, unusual noise or pipe movement, and whether tank filling or pressure recovery meets the expected result. Interpret these observations against the actual layout, including any documented draining features. The installation and commissioning checklist covers the broader handover record.

For selection help, start with the pump identity, water destination and available pipework sketch or photos. The next step is to agree which valve is already supplied, which separate parts are needed and which positions the relevant manual supports. QDD’s check valves and outlet fittings page provides a starting point for matching the equipment and connections.

Keep exploring

← All pump guides

Series appearance reference. Dimensions, model versions and included accessories are confirmed in the quotation.