An 80 m borehole with a water tank 200 m away does not automatically need 280 m of pump head. Borehole depth, vertical lift and pipe length describe different things. To calculate total dynamic head (TDH), start with the water level while pumping, the delivery point and the flow you need.
For the clear-water examples below, the calculation is:
TDH = vertical lift + required delivery pressure head + flow-dependent allowance.
The last term covers pipe and component losses, plus any outlet-velocity head needed for the chosen endpoint. Keep all terms in metres and calculate them at the same flow. The result should read “3 m³/h at 60 m TDH”, not simply “a 60 m pump”.
Start at the pumping water level
Use one elevation reference, such as ground level beside the borehole. Mark the water level below it and the delivery point above or below it.
The starting water level is the pumping water level at your design flow, under the conditions being designed for. It is not the depth of the drilled hole or the position of the pump. A borehole test report may list static water level, drawdown and pumping water level separately. Franklin Electric explains these water-level terms.
For example, a static level 25 m below ground with 20 m of drawdown gives a pumping level 45 m below ground. If the report already says “pumping water level: 45 m”, do not add that 20 m again.

A pump below that water surface has water pressure at its inlet. You therefore do not count its whole installation depth as the vertical lift. However, water still travels through the rising pipe from the pump to the surface, so that full pipe length matters when calculating friction. In the illustration, the water-level input is 45 m; the rising-pipe length is approximately 70 m. Neither number replaces the other.
If you only know the drilled depth, leave the pumping water level as “to confirm”. Ask for the existing pumping-test record, including the flow and when the level was recorded. The borehole contractor can establish whether it represents the intended pumping duration and seasonal conditions; do not estimate it from the motor’s kW rating.
Decide exactly where the water must arrive
For a pipe discharging freely into the top of an open tank, use the height of the free outlet. If that pipe ends 8 m above the borehole’s ground reference, the vertical lift from a pumping level 45 m below ground is:
8 − (−45) = 53 m of vertical lift.
The outlet is at atmospheric pressure, so the required pressure there is 0 bar gauge. You still need the pipe losses and the outlet-velocity term. If the pipe instead discharges below the water surface in an open tank, the tank’s design water-surface elevation can be used as the endpoint, with the appropriate losses. Do not add that water depth again as a second pressure requirement.
For direct supply to a house, irrigation manifold or other pressurised connection, specify both its elevation and the pressure required at that location while the design flow is passing. A pressure reading at the borehole head or with the pump stopped is not the same requirement.
For ordinary water, 1 bar ≈ 10.2 m of pressure head. Thus 2.5 bar is approximately 25.5 m. The underlying relationship is pressure head = pressure ÷ (water density × gravity); Wilo explains how pressure, elevation and velocity contribute to head.

If the borehole pump only fills an open storage tank and a separate booster supplies the house, the house-pressure requirement belongs to the booster calculation. Adding it to the borehole pump’s tank-filling duty would combine two different jobs.
Include the whole pipe route at the chosen flow
A 200 m horizontal pipe does not add 200 m of vertical lift. It adds friction, which depends on the flow, internal diameter and pipe characteristics. A long or narrow line can therefore change the required pump duty even on level ground.
Give the person calculating losses:
- The design flow and every pipe section’s actual length, including the full rising main below the pumping water level.
- Each section’s internal diameter, material and relevant condition. A nominal size or outside diameter alone may not identify the bore.
- The bends, valves, check valves and equipment the water passes through, with available manufacturer pressure-drop data.
Keep the scope consistent. If a filter is upstream of the agreed delivery point, its pressure loss belongs in the calculation for that point. If the route has different pipe diameters, calculate the sections separately. Use the expected equipment condition, such as the specified service limit for a filter, rather than inventing a universal allowance.
For an outlet or pressure point where water is moving, the energy associated with that velocity also needs accounting for. In this article it is included in the flow-dependent allowance. It is not an extra item to add again after using the example totals. The Hydraulic Institute’s system-head explanation sets out the elevation, pressure, velocity and loss terms and the conditions for simplifying them.
Ask for the loss total in metres at your stated flow, with its pipe and equipment assumptions. “Allow 10%” does not establish the loss in an unknown pipe route.
Two worked examples: tank filling and direct supply
Both examples use a design flow of 3 m³/h, or 50 L/min, and a pumping water level 45 m below the same ground reference. They are teaching examples, not measurements from a QDD installation. The borehole must separately be shown capable of sustaining the chosen pumping duty.
In Example A, water leaves a pipe freely into an open tank. The outlet is 8 m above the reference. In Example B, the delivery connection is 4 m above it and needs 2.5 bar while supplying the design flow. That pressure is an example requirement, not a recommendation for every house or irrigation system.
| Calculation item | A: Open tank | B: Direct supply |
|---|---|---|
| Design flow | 3 m³/h | 3 m³/h |
| Pumping level below ground | 45 m | 45 m |
| Delivery height above ground | 8 m | 4 m |
| Vertical lift | 53 m | 49 m |
| Required pressure head | 0 m | 25.5 m |
| Flow-dependent allowance | 7 m, rounded example | 9 m, assumed example |
| Total dynamic head | 60 m | 83.5 m |
Example A: 45 + 8 + 0 + 7 = 60 m TDH at 3 m³/h.
Example B: 45 + 4 + 25.5 + 9 = 83.5 m TDH at 3 m³/h.
Example B has a different delivery route and its 9 m allowance is a given assumption for the comparison, not a calculated result from Example A’s pipe. Replace it with the actual route and equipment calculation before selecting a pump.
Where the 7 m in Example A comes from
Here is a reproducible illustration for someone checking the pipe-loss part. Assume 150 m of pipe in total: 70 m of rising pipe and 80 m covering the remaining route to the outlet. Assume one internal diameter of 32 mm, a Darcy friction factor of 0.025 and a combined local-loss coefficient K of 8 for the route’s fittings. These coefficients are teaching inputs, not ratings for an unidentified pipe or valve set.
At 3 m³/h, the average pipe velocity is about 1.036 m/s. Using the Darcy–Weisbach pipe-loss relationship, straight-pipe loss = f × (L ÷ D) × v² ÷ (2g), with L and D in metres and g = 9.81 m/s²:
- Straight pipe: approximately 6.41 m.
- Fittings, using K × v² ÷ (2g): approximately 0.44 m.
- Free-outlet velocity head: approximately 0.055 m.
The total is approximately 6.91 m, rounded to 7 m for Example A. No separate exit-loss coefficient is included in that K assumption, so the free-outlet energy is not counted twice. For an actual installation, obtain appropriate friction factors and component data or use the supplier’s loss tables at the chosen flow; do not copy these coefficients into a different system.
Check the assumptions before choosing a pump
A correct sum can still describe the wrong operating condition. If the pumping water level falls from 45 m to 55 m below ground at the same flow, Example A needs another 10 m of lift: about 70 m TDH, with its other inputs unchanged. If the flow also changes, recalculate the pipe losses and check the corresponding water level as well.
The ground reference also matters. A tank platform 5 m uphill with an outlet 3 m above that platform has an outlet elevation of 8 m relative to the borehole ground, not 3 m. Where a route crosses a high point before descending, provide the full profile: the steady endpoint calculation does not by itself check filling, air handling or pressure at that high point.
Finally, do not compare the result only with a pump’s advertised maximum head. The next step is to check the actual curve at the required flow and the intended speed, along with the rest of the installation conditions. The borehole-pump sizing guide covers that wider selection process.
Turn the calculation into a useful enquiry
Send the flow and TDH together, followed by the assumptions that produced them. For Example A, a useful statement is: “We need 3 m³/h at about 60 m TDH to fill an open tank. Pumping water level is 45 m below ground; the free outlet is 8 m above ground. The example route allowance is 7 m and needs confirmation against the actual pipe and fittings.”
If information is missing, start with the borehole report you already have, a simple route sketch and whether you are filling a tank or supplying a pressurised connection. Mark unknowns clearly. You can use QDD’s pump-selection enquiry page to share that starting point; the final duty still needs the missing water-level, pressure and pipe-loss inputs confirmed.
The useful outcome is a flow-and-head requirement with traceable inputs, so a supplier can explain why the proposed pump will meet the job.